Illwerke Zentrum Montafon
Representing a huge step forward for timber-hybrid construction in Europe, CREE’s first external customer order showcases its versatility and aesthetic possibilities against an idyllic backdrop in Vorarlberg, Austria.
This building breaks the mold: rather than towering over its lakeside surroundings, the hydropower center commands yet complements the landscape with its imposing length of 120 m. Each 2,000 m2 floor level went up and was enclosed in an impressive 7 days. Complete with a works restaurant and visitor center, this project demonstrates the versatility of interior spaces in a CREE building. The IZM also represents a milestone in resource-efficient, sustainable construction: it is the first green building of its size in Vorarlberg and one of the largest office buildings in the world to use timber-hybrid construction. A bold and substantial step forward for CREE Buildings and Vorarlberger Illwerke AG.
CREE System Assembly Time
- 28 days
- 285 m2 per day
Dimensions
- Length: 120m
- Width: 16m
- GFA: 11500m2
- NFA: 10400m2
Awards
- DGNB Platinum Certification
- ÖGNI Platinum Certification
- Passive House Standard