Eunoia Junior College

Construction Workspace in Singapore, Singapore

Eunoia Junior College

Eunoia Junior College, completed in 2019, is the first CREE project in Asia. Located near Bishan-Ang Mo Kio Park, it features mass-engineered timber, CREE hybrid slabs, extensive greenery, and innovative sustainable elements, including a BCA Green Mark Platinum certification. Its design optimizes land use, reduces carbon footprint, and ensures energy efficiency with advanced systems and natural ventilation.
Project Name
Eunoia Junior College
Location
2 Sin Ming Pl, Singapore, Singapore
GFA
51500 m²
Start of construction
March 2017
Completion
January 2019
Type of use
Educational
Project stage
Completed
Height
56 m
CREE System Type
RSP Standard
Certifications & Awards
BCA Green Mark Award Platinum 2018
Main CREE Project Partner
Kimly Construction
Building Services Engineers
CPG Consultants Pte Ltd
Client
Ministry of Education
Subcontractors & Suppliers
HASSLACHER Group
About

Eunoia Junior College

2019 saw the completion of the first building project using CREE in Asia. The result of a collaboration with local partners Kimly Construction and Lian Ho Lee Construction in Singapore, the impressive building houses Singapore’s first high-rise junior college. The use of mass engineered timber and the CREE hybrid slab system not only contributed to heightened construction productivity, but the resulting open spaces, integrated greenery, and tranquil environment offer students the ideal surroundings for building a successful professional future.

Location

located next to 62 ha Bishan-Ang Mo Kio Park and Kallang River

Architecture

singapore’s first ‘highrise’ junior college, first School in Singapore with an elevated stadium, extensive greenery with rooftop garden, expansive open spaces and greenery lining on walls, multiple floors of school separated with green spaces that are accessible for staff and students

Sustainable Elements

CLT Façade and Cree Hybrid Slabs

Land Use

optimal land usage with smaller footprint compare to conventional school building

Carbon Footprint During Construction Stage

reduce in carbon footprint with the use of CLT Façade and Cree Hybrid Slab, prefab Precast Sustainable Wall, extensive use of environmentally friendly construction materials such as Recycled Concrete Aggregates and Washed Copper Slag

Environmentfriendly Building

achieved BCA GreenMark Platinum, high Performance water cooled system with design system efficiency of 0.58 kW/RT and VRV system of 0.7kW/RT, no west facing façade for non-air conditioned areas, rainwater harvesting for irrigation

Natural Ventilation

CFD simulation during design stage to ensure well ventilated classroom with adequate fresh air supply

Operation Costs

sage of high efficiency LED and T5 lighting with energy savings of 51.09 %, energy usage monitoring system